Ongoing construction
270 Homes, 10 Buildings and One EnergyNet
In Lund the future of Energy distribution is being built in the Neighborhood called “the old” west. When the installation goes live in 2026 the need of power from the traditional grid will be reduced by 60% and for 6 month of the year no electricity is bought from the old grid.